waterproofing contractor singapore

waterproofing contractor singapore

the elastic sealing material; ⑸ waterproof test the water test results. Bathroom waterproofing contractor singaporeSeepage reason First, the structure construction 1 water gray gravel concrete ratio is not correct, causing plate, beam cracks. 2 concrete pouring concrete when the initial setting time has elapsed. 3 pouring interrupted for too long, cold forming construction joints. 4. pouring enough vibration or super vibration, waterproofing contractor singapore2 construction steps 1 First of cement and sand stir, then add JE-Ⅰ and water. should be clean run, using plain water, mud slurry full sweep, then dry hard concrete 2 times half block, after the first outer, full tamping dense, downspouts Kazi drilling downward 3 ° -5 °, staples sets of expansion hose brush epoxy resin embedding, prohibited the use of wedge. Screw holes on waterproofing contractor singapore the concrete shear walls around hewn bell sh should be cut later, the bell wiping real flatten after a given pulp, available iron trowel cut anti-rub, and then painted a prime grout. Third, to ensure the construction quality of exterior wall tile 1 veneered brick preceded by checking whether the hollowing leveling layer, from the shell, cracks and uneven, if immediate repaiwaterproofing contractor singaporer should be qualified, then rinsed with pure mud (mixed with 10% 107 glue) on thee design, the designer of these sites require enhanced treatment, a detailed plot. Full account of structural deformation, temperature deformation, affecting shrinkage deformation, vibration, etc., using the node waterproofing contractor singaporesealed, anti-row combination of rigid complementary, multi-channel fortification and other practices to meet the needs of the grassroots deformation. From the construction, pre-construction roofing construction should develop special programs for construction workers to detailed tests, and let them be aware of the operation points to ensure the reliability of the nodes waterproof. Six, wall leakage test measures  another is water repellent nano-silicon, nano-silicon series are waterproof paint. This coating waterproof effect is good, but the price is higher. Price per kilogram is about 40-50 yuan. When making waterproof construction: The first step: the grassroots should be tse it will affect the waterproof effect. In yin and yang angle, pipe roots can add a layer of glass fiber cloth, to enhance the role play. If the selection of polyurethane waterproof coating, repeated brushing 2-3 times on it. Flexible polyurethane coating itself can form a protective film, with a certain resistance to pull performance. In order to improve the waterproof effect, paving layer of glass cloth, but the cost will increase. The third step: to closed water test, closed water test is an important means of inspection test indoor water quality. After the waterproofing finish, sealed the door and drain, the water fills the room reaches a certain level height, within 24 hours if there is no significant decline in the level, that is qualified. After the closed water test is complete, do a layer owaterproofing contractor singaporef cement mortar protective layer on the waterproof coating layer, be careful not to damage the waterproof coating layer is ready. And other protective layer of dry cement mortar, paving tiles can be above or stencilled paint a normal decoration. 7 Related Books Editing Basic Information (B) water vapor pressure changes: Water penetration into the building once inside, in a limited space, such as sun drying, to produce heat, to form water vapor, wh underground structures of metal waterproof layer. ir pressure, convection, shock, adhesion, capillary and other forces, and gradually penetrate inside the building, but also in the process of infiltration is not easy to find from the surface. In other words, look for leaks reason you must thoroughly “visceral” analysis and judgment, in order to remedy.http://www.allstarwaterproofing.com.sg/

Comments are closed.